- Project (time) Control for an EPC project
Industrial department has been working in lots of EPC projects as MC or main consulter. Preparing the technical documents and tender documents are some of these activities.
Engineering
Procurement
KCE provides consulting services to ascertain the qualification of prospective vendors
Construction
KCE provides project control and management system during construction
As part of the tasks and responsibilities of project control, the aspect of (time) control during the course of a project can be applied in many ways.
The main elements which can influence the aspect (time) control during an Engineering,
Procurement & Construction project (EPC project) are described in this document. Each of these elements contributes significantly to the effective control of a project.
Three phases of project control are identified during an EPC project. Within these phases, a number of subjects are described which have a relation with the aspect (time) control.
1: Preparation phase
1.1 Project Execution Plan
1.2 Risk management & analysis
1.3 Project network planning
1.4 Control tools for the project phases
2: Control and reporting phase
2.1 Reliable (project) information
2.2 Timely availability of information
2.3 Consistent availability of information
2.4 Project control as “bottleneck”
2.5 Changing circumstances
2.6 Competence of project members
2.7 Role of the project control employee
3: Evaluation phase
3.1 “As built” project control information
3.2 Project close-out reporting
- Commissioning
KCE supervise various commissioning stages of beneficiation plants
- Engineering Design
Designing of different production process as basic and detail is one of the other activities of this department.
- Special fields
This department is profession in field of stoves and incombustible as wigan. Supervising on and warming the stoves are other activities of this department.
- Industrial supervision
Managing of supervising projects on Commissioning and maintenance of the production lines specially sections are at this department proficiency.
|